logo
ProjectDesign Development

Luxstone Pedestrian Underpass

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The Work is comprised of approximately: Mobilization & Demobilization 1 LS Pathways Removal 240 m 2 Remove & Dispose of Existing Fence 100 m Clearing & Grubbing 1 LS Topsoil Stripping & Stockpile 865 m 3 WasteExcavation & Dispose Offsite 2,450 m 3 Topsoil Placement & Seeding (300mm depth) 2,880 m 2 Asphalt Pathway (includes GBC) 360 m 2 Mobilize Temporary Bridge to Site 1 LS Demobilize Temporary B

Status
Prospective
Sector
Commercial, Water Supply and Storage, Bridge, Car parking, Power Generation (CCGT), Power Transmission, Road, Tunnel, Waste Processing and Treatment, Government, Automotive
Location
Airdrie, Alberta, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Luxstone Pedestrian Underpass

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Luxstone Pedestrian Underpass” is an infrastructure initiative in the Commercial sector, located in Airdrie, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

design development

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Work is comprised of approximately: Mobilization & Demobilization 1 LS Pathways Removal 240 m 2 Remove & Dispose of Existing Fence 100 m Clearing & Grubbing 1 LS Topsoil Stripping & Stockpile 865 m 3 WasteExcavation & Dispose Offsite 2,450 m 3 Topsoil Placement & Seeding (300mm depth) 2,880 m 2 Asphalt Pathway (includes GBC) 360 m 2 Mobilize Temporary Bridge to Site 1 LS Demobilize Temporary Bridgefrom Site 1 LS Installation & Removal of Temporary Bridge 1 LS Supply &Installation ? Drille...

Procurement method

Location

Country

Canada

State

Alberta

City

Airdrie

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Bridge, Car parking, Power Generation (CCGT), Power Transmission, Road, Tunnel, Waste Processing and Treatment, Government, Automotive

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project