logo

Luz del Norte

Sector: Road • Location: Chile

Source: International Finance Corporation (IFC)

Project
Completed

The project under consideration will install a photovoltaic (PV) solar plant to generate 141.04 MW AC of solar energy to be supplied to the Chilean Central Interconnected System (SIC). The project is located in the Atacama Desert, considered one of the driest and sunniest places in the world, in the Llano de Varas, Province of Copiapó, approximately 60 kilometers to the Northeast of the city of

Project Information FAQ

Project Information

4 Q
The project “Luz del Norte” is an infrastructure initiative in the Road sector, located in Chile. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project under consideration will install a photovoltaic (PV) solar plant to generate 141.04 MW AC of solar energy to be supplied to the Chilean Central Interconnected System (SIC). The project is located in the Atacama Desert, considered one of the driest and sunniest places in the world, in the Llano de Varas, Province of Copiapó, approximately 60 kilometers to the Northeast of the city of Copiapó. It is placed on a fenced 456 ha property of the Chilean government leased to First Solar for the project. The closest settlement, the town of Carrera Pinto, is located 7.8 km away from the project. The closest indigenous community, out of the six indigenous communities in the district of Copiapó, is located 19 km distant from the project. There was presence of cultural heritage within the project site including some areas of secondary archeological interest were near the transmission line route. The landscape in the region is typical of deserts and arid areas, with no nearby inhabitants or proximity to either critical or preserved habitats. The solar panels to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the utility power grid system. As part of the project, the Company will also (a) open a 0.5 km access road, (b) add an interconnection panel to the existing 220 kV Carrera Pinto substation, and (c) install a 2 km (220 kV) transmission line, with a right-of-way (ROW) of 40 m.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data