logo
ProjectCompleted

Luz del Norte

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

The project under consideration will install a photovoltaic (PV) solar plant to generate 141.04 MW AC of solar energy to be supplied to the Chilean Central Interconnected System (SIC). The project is located in the Atacama Desert, considered one of the driest and sunniest places in the world, in the Llano de Varas, Province of Copiapó, approximately 60 kilometers to the Northeast of the city of

Status
Closed
Sector
Solar, Power Generation (CCGT), Power Transmission, Road, Commercial, Government
Location
Chile
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Luz del Norte

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Luz del Norte” is an infrastructure initiative in the Solar sector, located in Chile. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project under consideration will install a photovoltaic (PV) solar plant to generate 141.04 MW AC of solar energy to be supplied to the Chilean Central Interconnected System (SIC). The project is located in the Atacama Desert, considered one of the driest and sunniest places in the world, in the Llano de Varas, Province of Copiapó, approximately 60 kilometers to the Northeast of the city of Copiapó. It is placed on a fenced 456 ha property of the Chilean government leased to First Solar for the project. The closest settlement, the town of Carrera Pinto, is located 7.8 km away from the project. The closest indigenous community, out of the six indigenous communities in the district of Copiapó, is located 19 km distant from the project. There was presence of cultural heritage within the project site including some areas of secondary archeological interest were near the transmission line route. The landscape in the region is typical of deserts and arid areas, with no nearby inhabitants or proximity to either critical or preserved habitats. The solar panels to be installed will convert sunlight to DC (Direct Current) electricity. The DC power will be sent to an inverter to convert the DC power into AC (Alternate Current) power which will then be fed into the utility power grid system. As part of the project, the Company will also (a) open a 0.5 km access road, (b) add an interconnection panel to the existing 220 kV Carrera Pinto substation, and (c) install a 2 km (220 kV) transmission line, with a right-of-way (ROW) of 40 m.

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

Chile

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Power Transmission, Road, Commercial, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project