Luzboa Small Hydro Power Plants BRA-Minas Gerais I (Phase I)
Sector: Hydro • Location: Brazil
Source: World Bank Group
In August 2009, Luzboa S.A, a private firm was developing a portfolio of four small run of the river hydroelectric plants in the state of Minas Gerais through a license granted by Brazilian federal regulator Aneel. The first two plants to reach financial closure were PCH Oliveira [2.88MW] in the municpality of Oliveira and PCH Couro do Cervo [1.5MW] in the municipality of Nepomuceno. These two uni
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Luzboa Small Hydro Power Plants BRA-Minas Gerais I (Phase I)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In August 2009, Luzboa S.A, a private firm was developing a portfolio of four small run of the river hydroelectric plants in the state of Minas Gerais through a license granted by Brazilian federal regulator Aneel. The first two plants to reach financial closure were PCH Oliveira [2.88MW] in the municpality of Oliveira and PCH Couro do Cervo [1.5MW] in the municipality of Nepomuceno. These two units will be responsible for the reduction of about 90,000 tonnes of CO2 for the period in which energy is already sold, contributing to the development of the State of Minas Gerais. Luzboa SA was owned by investment firms from the Virgin Islands and Brazil. The total project cost was estimated at BRL 12.1 million (US $6.9 million) for Oliveira and BRL 6.4 million (US $3.6 million) for Couro do Cervo. The projects reached financial closure in January 2010 when Luzboa SA signed loans with the state-owned local bank BDMG, acting through a program of BNDES. The loan amounts for Oliveira and PCH Couro do Cervo were BRL 7.6 million (US $4.3 million)and BRL 4.5 million (US $2.6 million) respectively. In July 2010, PCH Oliveira commenced operations. In November 2011, the regulatory agency Aneel rejected the design project for PCH Couro do Cervo and the project was tagged as not active. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Foz do Chapeco Hydroelectric Power Plant
- Atiaia Energia S.A.
