logo

Luzboa Small Hydro Power Plants BRA-Minas Gerais I (Phase I)

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

In August 2009, Luzboa S.A, a private firm was developing a portfolio of four small run of the river hydroelectric plants in the state of Minas Gerais through a license granted by Brazilian federal regulator Aneel. The first two plants to reach financial closure were PCH Oliveira [2.88MW] in the municpality of Oliveira and PCH Couro do Cervo [1.5MW] in the municipality of Nepomuceno. These two uni

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Luzboa Small Hydro Power Plants BRA-Minas Gerais I (Phase I)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Luzboa Small Hydro Power Plants BRA-Minas Gerais I (Phase I)” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In August 2009, Luzboa S.A, a private firm was developing a portfolio of four small run of the river hydroelectric plants in the state of Minas Gerais through a license granted by Brazilian federal regulator Aneel. The first two plants to reach financial closure were PCH Oliveira [2.88MW] in the municpality of Oliveira and PCH Couro do Cervo [1.5MW] in the municipality of Nepomuceno. These two units will be responsible for the reduction of about 90,000 tonnes of CO2 for the period in which energy is already sold, contributing to the development of the State of Minas Gerais. Luzboa SA was owned by investment firms from the Virgin Islands and Brazil. The total project cost was estimated at BRL 12.1 million (US $6.9 million) for Oliveira and BRL 6.4 million (US $3.6 million) for Couro do Cervo. The projects reached financial closure in January 2010 when Luzboa SA signed loans with the state-owned local bank BDMG, acting through a program of BNDES. The loan amounts for Oliveira and PCH Couro do Cervo were BRL 7.6 million (US $4.3 million)and BRL 4.5 million (US $2.6 million) respectively. In July 2010, PCH Oliveira commenced operations. In November 2011, the regulatory agency Aneel rejected the design project for PCH Couro do Cervo and the project was tagged as not active.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project