Luzboa Small Hydro Power Plants BRA-Minas Gerais I (Phase I)

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

In August 2009, Luzboa S.A, a private firm was developing a portfolio of four small run of the river hydroelectric plants in the state of Minas Gerais through a license granted by Brazilian federal regulator Aneel. The first two plants to reach financial closure were PCH Oliveira [2.88MW] in the municpality of Oliveira and PCH Couro do Cervo [1.5MW] in the municipality of Nepomuceno. These two uni

Project Information FAQ

Project Information

5 Q
The project “Luzboa Small Hydro Power Plants BRA-Minas Gerais I (Phase I)” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In August 2009, Luzboa S.A, a private firm was developing a portfolio of four small run of the river hydroelectric plants in the state of Minas Gerais through a license granted by Brazilian federal regulator Aneel. The first two plants to reach financial closure were PCH Oliveira [2.88MW] in the municpality of Oliveira and PCH Couro do Cervo [1.5MW] in the municipality of Nepomuceno. These two units will be responsible for the reduction of about 90,000 tonnes of CO2 for the period in which energy is already sold, contributing to the development of the State of Minas Gerais. Luzboa SA was owned by investment firms from the Virgin Islands and Brazil. The total project cost was estimated at BRL 12.1 million (US $6.9 million) for Oliveira and BRL 6.4 million (US $3.6 million) for Couro do Cervo. The projects reached financial closure in January 2010 when Luzboa SA signed loans with the state-owned local bank BDMG, acting through a program of BNDES. The loan amounts for Oliveira and PCH Couro do Cervo were BRL 7.6 million (US $4.3 million)and BRL 4.5 million (US $2.6 million) respectively. In July 2010, PCH Oliveira commenced operations. In November 2011, the regulatory agency Aneel rejected the design project for PCH Couro do Cervo and the project was tagged as not active.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data