LVOLT 161 Commonwealth AV
Sector: Broadband • Location: Boston, Massachusetts, United States of America
Source: City of Boston
This proposed system is designed to meet and exceed the bid specifications for the security system. Starting with the CADDX NX8e alarm panel: this control panel will provide the ease of use and flexibility that clients expect today. English display keypads will display the alarm condition and zone status. The keypads also include emergency activation buttons for police and fire. The system ea
- Status
- Prospective
- Sector
- Broadband, Telecommunications, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about LVOLT 161 Commonwealth AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This proposed system is designed to meet and exceed the bid specifications for the security system. Starting with the CADDX NX8e alarm panel: this control panel will provide the ease of use and flexibility that clients expect today. English display keypads will display the alarm condition and zone status. The keypads also include emergency activation buttons for police and fire. The system easily supports the schedule of protection with the ability to add additional hardwired or wireless zones in the future. While it is not called for in the bid spec, there is a network module that could be added to the system that would allow the client to remotely arm and disarm the alarm system through the Web. It is an inexpensive add-on. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Broadband, Telecommunications, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
