LVOLT 905 Commonwealth AV
Open · Massachusetts
Source: City of Boston
Mitsubishi VRF BACnet Interface
• One (1) new SmartStruxure AS-P power supply and associated mounting base, control enclosure and mech space. Exact location on 2nd flr to be determined.
• Electrical installation o Mounting of control enclosure, AS-P and power supply in central location. o CAT5 connection to IT network jack for BMS interface will be required, and is to be provided by project o 1
- Status
- Prospective
- Sector
- Nuclear, Power Generation (CCGT), Steel, Telecommunications, Advanced Electronics, Manufacturing (Industrial), Metal, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about LVOLT 905 Commonwealth AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Mitsubishi VRF BACnet Interface • One (1) new SmartStruxure AS-P power supply and associated mounting base, control enclosure and mech space. Exact location on 2nd flr to be determined. • Electrical installation o Mounting of control enclosure, AS-P and power supply in central location. o CAT5 connection to IT network jack for BMS interface will be required, and is to be provided by project o 120v control power to SE panel by others o Network connection to Mitsubishi BACnet integration controller. Assume to be installed in general vicinity to SE panel o **Assume interconnect wiring for VRF system and wall sensors to be provided by others. Fresh Air Terminal Units • Electrical installation of (8) new b3866V terminal unit controllers and discharge air sensors, for control and monitoring of VV-boxes • Procurement and install of centrally mounted 24V control transformer and associated LV power wiring to terminal unit devices New Roof Top AHU • Existing RTU to be replaced with new device. Assume RTU to be shipped with BACnet interface. Field installation of the following equipment, to include: • New relays, CT’s, and associated hardware for enable, status, and DA-T reset to existing RTU, through SE BMS • Electrical installation of remote hardwired points for start/stop, status, and fault of existing RTU • Electrical extension and connection of BACnet comm trunk for integration to factory RTU controller, as available • Electrical installation of manufacturer provided, hardwired control devices and sensors, per design drawing. Assume all factory field installed devices to be provided by RTU manufacturer. Devices to be hardwired back to RTU factory controller for proper operation. Duct smoke detector to be provided and installed by others, but wired for RTU shutdown be SE Perimeter Baseboard Radiation • Four (4) new Belimo 2-way, HW radiation control valves • Four (4) new TE200G glass mounted glazing temperature sensors • Electrical install of new temp sensors and wiring back to associated controller • Electrical installation of new control valves and wiring back to associated controller. Mechanical installation of control valves by others Treatment Room CO2 Monitoring • Sixty (60) new AQW series, BACnet wall mount CO2 sensors • Four (4) new stepdown transformers • Electrical install of new CO2 sensors, power loop wiring, BACnet communication to each sensor 1st Flr Boiler Rm and HW Loop • Boiler controller o Enable and monitoring of (1) new wall-hung boiler and HW Pump-1 o Enable and monitoring of HW Pump-2. *Assume pump to be purchased with integrated DP sensor control, per SOO. No remote 2/3 DP sensor or installation has been included o Monitoring of HW S/R temps for both primary and secondary HW loops o Remote mounted EPO button, enclosure and cover, to be located outside boiler rm door • Installation of one (1) new BSD120IL-PILCHOVA remote boiler shut off button and alarm. Button to be located outside the door of the boiler room • BACnet connection to boiler and HW Pump-2, as available • Electrical install of control hardware and comm trunk to boiler, pumps, sensors, and associated hardware Exhaust Fan Control EX-1 • Assume damper, actuator, and associated hardware to be located below roof decking. No provisions for weather tight enclosures or externally mounted actuators • One (1) new Belimo 2-position actuator with endswitch • One (1) new CD-50 series, low leakage aluminum damper • New static pressure safety switches • New relays, CT’s and associated hardware for control and monitoring of exhaust fan • Electrical installation of new damper actuator, safety switches, fan controls, and associated hardware. EX-2 • Procurement of (1) new Belimo 2-position actuator with endswitch • Procurement of (1) new CD-50 series, low leakage aluminum damper • Electrical installation of new damper actuator and associated hardware. No BMS interface to exhaust damper system – all interconnections to be hardwired • Interconnect wiring between infrared light switch wall sensor (by others) and exhaust fan, for control of exhaust damper VRF Network Wiring and Thermostats • Provide low voltage electrical wiring for VRF system and associated thermostats. Assume all required Mitsubishi hardware and devices to be provided by mechanical contractor • Electrical control wiring of Mitsubishi VRF’s, to include: o System-1 ~ Extension of comm cabling between (16) cassettes, (1) BC, and (1) roof condenser. Install and wiring of associated temp sensors back to respective cassettes o System-2 ~ Extension of comm cabling between (15) cassettes, (1) BC, and (1) roof condenser. Install and wiring of associated temp sensors back to respective cassettes o System-3 ~ Extension of comm cabling between (18) cassettes, (1) BC, and (1) roof condenser. Install and wiring of associated temp sensors back to respective cassettes o System-4 ~ Extension of comm cabling between (1) cassette, (1) roof condenser, and 1 stat for computer rm o System-5 ~ Extension of comm cabling between (1) cassette, (1) roof condenser, and 1 stat for electric rm o Mounting and powering of Mitsubishi BACnet interface controller, in vicinity of BMS controller o All control wiring shall be run in series-fashion |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT), Steel, Telecommunications, Advanced Electronics, Manufacturing (Industrial), Metal, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
