Lyco House / OYO
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
Text description provided by the architects.OYO Architects, the architecture studio with offices in Ghent and Barcelona, led by Ferran Massip, Nigel Jooren, Eddy Soete, Veroniek Vanhaecke, and Lies Willaert, presents Lyco House. Located in the green countryside ofPepingen, less than 30 kilometres from Brussels, this project transforms an old barn into a contemporary and sustainable 312 m² home. Th
- Status
- Closed
- Sector
- Commercial, Residential, Government
- Location
- Belgium
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Lyco House / OYO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Text description provided by the architects.OYO Architects, the architecture studio with offices in Ghent and Barcelona, led by Ferran Massip, Nigel Jooren, Eddy Soete, Veroniek Vanhaecke, and Lies Willaert, presents Lyco House. Located in the green countryside ofPepingen, less than 30 kilometres from Brussels, this project transforms an old barn into a contemporary and sustainable 312 m² home. The design stands out through a particular architectural intervention: a triangular cut in the original volume shapes an inner courtyard that floods the house with natural light, while generating a fluid transition to the outside. |
Location
Country | Belgium |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Government |
Article published date | 2025-07-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Belgium
- Norther Offshore Wind Farm
- ConAgra Foods Lamb Weston Frozen Potato Processing Facility Expansion
- Cargill’s Kalmthout Production Facility Expansion, Belgium
- UCB’s Gene Therapy Facility, Braine l’Alleud, Wallonia, Belgium
- weave.ly
- Carbon2Value: (Interreg2seas)
- Rodenhuize Power Station
- Thornton Bank Offshore Wind Farm North Sea
