logo

Lynch Plant adopts new GKD Cat 308 RCi machine control solutions

Sector: Road • Location: United Kingdom

Source: Highways Today

Project
Ongoing

Machine control manufacturer, GKD Technologies has been supplying nationwide plant hire specialists L Lynch Plant Hire since 2017. GKD Technologies have a team of preferred installers who work with Lynch Plant. The machines are located all over the UK and installs on new machines are taking place every week nationwide. One of the latest installs for L Lynch Plant Hire, by RK Plant Engineers, manag

Project Information FAQ

Project Information

4 Q
The project “Lynch Plant adopts new GKD Cat 308 RCi machine control solutions” is an infrastructure initiative in the Road sector, located in United Kingdom. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Machine control manufacturer, GKD Technologies has been supplying nationwide plant hire specialists L Lynch Plant Hire since 2017. GKD Technologies have a team of preferred installers who work with Lynch Plant. The machines are located all over the UK and installs on new machines are taking place every week nationwide. One of the latest installs for L Lynch Plant Hire, by RK Plant Engineers, managing director, Ryan Andres was for two, 2RCI (Rated Capacity Indicators) on a brace of CAT 308’s, which Lynch has recently added to its growing fleet. What makes this system unique, is that it was designed specifically for the CAT 308 machine by GKD and utilises the capabilities of the 2RCI system, with full protection and slew walls, including offset boom monitoring with motion cuts.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data