Lyons SSSI and Drainage Improvements
Sector: Raw Materials • Location: Lyons, Georgia, United States of America
Source: Dodge USA
The Construction includes the installation of approximately 1,848 LF of 8 Gravity Sewer, 1,296 LF of 10 Gravity Sewer, 310 TNS of 9.5mm superpave, striping, and 210 VF of 4 Pre-Cast Manholes along with all appurtenances necessary to complete the job. The construction of 210 LF of 30 RCP pipe, 64 LF of 42 RCP, 4 GDOT STD 1125 headwalls, 30 SY GDOT STD Type 1 Rip-Rap, regrading ditch, 709 SY of mill
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Construction includes the installation of approximately 1,848 LF of 8 Gravity Sewer, 1,296 LF of 10 Gravity Sewer, 310 TNS of 9.5mm superpave, striping, and 210 VF of 4 Pre-Cast Manholes along with all appurtenances necessary to complete the job. The construction of 210 LF of 30 RCP pipe, 64 LF of 42 RCP, 4 GDOT STD 1125 headwalls, 30 SY GDOT STD Type 1 Rip-Rap, regrading ditch, 709 SY of milling, 287 SY Class A pavement removal and replacement, and all other necessary appurtenances for a... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Raw Materials projects in United States of America
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
- Additional Farm Projects
