M-12A Well Site Equipping and Improvements
Sector: Water Supply and Storage • Location: Banning, California, United States of America
Source: Dodge
SUMMARY OF WORK A. The work generally includes, but is not limited to construction of the following: 1. Demolition of existing equipment and facilities per the project drawings. 2. Grading and paving existing M12A well site per the project drawings. 3. Construction of new well building per the project drawings. 4. Equipping new M12A well with mechanical equipment, instrumentation, piping, and appu
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
- Location
- Banning, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about M-12A Well Site Equipping and Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SUMMARY OF WORK A. The work generally includes, but is not limited to construction of the following: 1. Demolition of existing equipment and facilities per the project drawings. 2. Grading and paving existing M12A well site per the project drawings. 3. Construction of new well building per the project drawings. 4. Equipping new M12A well with mechanical equipment, instrumentation, piping, and appurtenances per the project drawings. 5. Providing electrical power and control to new equipment an... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Banning |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial, Power Generation (CCGT) |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
