logo

M3 Toll Road

Sector: Automotive • Location: Ireland

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects M3 Toll Road Republic of Ireland M3's website $616.6M Investment 50 Miles of length 2007-2052 Concession period 2010 Opening date The M3 Toll Road entails an average saving of 17 minutes in driving time along the route. A reduction of more than 30% in the accident rate in comparison to the old N3 road is expected. The biggest project ever carried out in Ireland

Project Information FAQ

Project Information

5 Q
The project “M3 Toll Road” is an infrastructure initiative in the Automotive sector, located in Ireland. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects M3 Toll Road Republic of Ireland M3's website $616.6M Investment 50 Miles of length 2007-2052 Concession period 2010 Opening date The M3 Toll Road entails an average saving of 17 minutes in driving time along the route. A reduction of more than 30% in the accident rate in comparison to the old N3 road is expected. The biggest project ever carried out in Ireland The M3 provides a strategic link between Dublin and the Northeast of Ireland. It runs from Clonee to the North of Kells, northeast of Dublin. With a length of 50 km and an investment exceeding 484 million Euros, the M3 highway is the biggest engineering project ever carried out in the Republic of Ireland. Saving driving time The M3 entails an average saving of 17 minutes in driving time along the route. A reduction of more than 30% in the accident rate in comparison to the old N3 road is expected. Enormous cultural and tourism-related This highway has released a large proportion of the surrounding urban centers from heavy goods transit. This is a vital boost to conservation of the area’s outstanding cultural heritage. Responsible building and concern for the surroundings Building the M3 has entailed more than 3.5 million m3 of excavations, a 6.3 million m3 embankment and transport of another 2.5 million m3 of earth to landfills. The route includes 41 Overbridges, 22 Underpasses, 6 interchanges and 2 Toll PLazas along the route.  Highlighted data 35,346 Vehicles / day Opening date 4th June 2010

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data