MA-23 & 24 Summit St & High St Phase I & II Improvements
Sector: Water Supply and Storage • Location: Norwood, New Jersey, United States of America
Source: Dodge USA
The project consists of milling and resurfacing portions of Summit Street and High Street in the Borough of Norwood, including but not limited to milling and resurfacing, resetting drainage and utility structures, installing pavement markings, reconstructing manholes and inlet structures if & where directed, constructing RCP storm sewer, full depth roadway repairs if & where directed, curb replace
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Power Transmission, Car parking, Government, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial
- Location
- Norwood, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MA-23 & 24 Summit St & High St Phase I & II Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of milling and resurfacing portions of Summit Street and High Street in the Borough of Norwood, including but not limited to milling and resurfacing, resetting drainage and utility structures, installing pavement markings, reconstructing manholes and inlet structures if & where directed, constructing RCP storm sewer, full depth roadway repairs if & where directed, curb replacement if & where directed, and sidewalk replacement if & where directed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Norwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Power Transmission, Car parking, Government, Waste Processing and Treatment, Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
