Maamba Coal-Fired Power Plant- Phase-I
Sector: Water Supply and Storage • Location: Zambia
Source: World Bank Group
Maamba coal-fired power plant is located within Siankondobo coalfield in south Zambia and will have a total capacity of 600MW. The plant is being developed in two phases. The first phase involves revamping of the Maamba coal mine and the construction of a mine–mouth, 300MW Coal Fired Power Plant (CFPP) comprising two-150 MW units, together with water reservoir and water pipeline from Lake Kariba t
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Commercial, Government
- Location
- Zambia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Maamba Coal-Fired Power Plant- Phase-I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Maamba coal-fired power plant is located within Siankondobo coalfield in south Zambia and will have a total capacity of 600MW. The plant is being developed in two phases. The first phase involves revamping of the Maamba coal mine and the construction of a mine–mouth, 300MW Coal Fired Power Plant (CFPP) comprising two-150 MW units, together with water reservoir and water pipeline from Lake Kariba to the water reservoir. The project company is owned by Nava Bharat (65%) and ZCCM Investment Holdings (35%). The plant has a 30-year power purchase agreement for 300MW of capacity with state utility Zesco. The total project cost for the first phase is USD $830 million. Financing comprises USD $515 million debt facility split between direct loans from development finance institutions and a bank facility covered by a guarantee from Chinese export credit agency Sinosure and sponsor equity of USD $315 million including a shareholder bridge loan of USD $65 million. Development Bank of Southern Africa and the Industrial Development Corporation provided direct loans totalling $150 million. The Sinosure covered facility totalled $365 million, and featured the following banks: ICBC, Bank of China, Standard Chartered and ABSA. All of the debt has a tenor of construction plus 10 years, with work expected to be complete on the project in about one year.The African Development Bank was also expected to participate as a lender, but dropped out at a late stage. The sponsors decided to plug the funding gap with the shareholder bridge loan of USD $65 million. They intend to bring an additional senior lender into the deal post-close to repay the bridge loan. |
Original sector | Energy |
Budget |
Location
Country | Zambia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Commercial, Government |
Article published date | 2024-05-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Zambia
- Kafue Gorge Lower KGL Power Station
- Open for FDI through a majority stake/Development of a new project/Aquaculture/FINGERLING PRODUCTION PROJECT
- Mutinondo Luchenene Hydroelectric Project
- Lufubu Hydropower Project
- YATU OUTGROWER SCHEME
- Kawambwa tea estate
- Sinohydro Kafue Gorge Lower HPP
- Zambia Mining Township Service Project water and sanitation services
