logo

Mabey to install temporary bridges for Thames Tideway construction

Sector: Bridge • Location: London, United Kingdom

Source: Highways Today

Project
Ongoing

Leading bridge and engineering services specialist Mabey is installing two temporary bridges to support the Thames Tideway Tunnel project – a major new sewer that will tackle the problem of overflows from the capital’s Victorian sewers and protect the tidal River Thames from pollution. The new bridges are needed to transport tonnes of construction waste away from the riverside to barges, which wil

Project Information FAQ

Project Information

5 Q
The project “Mabey to install temporary bridges for Thames Tideway construction” is an infrastructure initiative in the Bridge sector, located in London, United Kingdom. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Leading bridge and engineering services specialist Mabey is installing two temporary bridges to support the Thames Tideway Tunnel project – a major new sewer that will tackle the problem of overflows from the capital’s Victorian sewers and protect the tidal River Thames from pollution. The new bridges are needed to transport tonnes of construction waste away from the riverside to barges, which will then carry it to disposal sites. The 90-metre, three-span bridges will be in place for a minimum of five years, carrying thousands of trucks leaving the tunnelling construction. The modular bridges have been manufactured in Gloucestershire before being delivered flat-packed for assembly on site. They will connect land to a temporary pontoon structure to ensure the construction process is not delayed by tide conditions.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data