MacArthur Maze/Increase Vertical
Sector: Automotive • Location: CA, United States of America
Source: US Department of Transportation (USDOT)
Other Agencies with Actions or Authorizations: California Description: The California Department of Transportation (Caltrans) proposes the MacArthur Maze Vertical Clearance Project (project or proposed action) to increase the vertical clearances at three locations within the MacArthur Maze Interchange (MacArthur Maze or Maze) in the City of Oakland, Alameda County. Two of the locations are along t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Other Agencies with Actions or Authorizations: California Description: The California Department of Transportation (Caltrans) proposes the MacArthur Maze Vertical Clearance Project (project or proposed action) to increase the vertical clearances at three locations within the MacArthur Maze Interchange (MacArthur Maze or Maze) in the City of Oakland, Alameda County. Two of the locations are along the connector from westbound (WB) Interstate 80 (I-80) to southbound (SB) Interstate 880 (I-880), as it crosses below the WB and eastbound (EB) Interstate 580 (I-580) overcrossings. The third location is along the connector from WB I-80 to EB I-580 as it crosses below the connector from WB I-580 to WB I-80. The existing vertical clearance at these three locations does not meet the current Caltrans standard of 16 feet 6 inches and impedes the safe and efficient movement of oversized vehicles and loads through the Maze. The project is proposed to increase the vertical clearance of the structures in the Maze to allow for more efficient travel of oversized vehicles. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
