logo

Macau Refuse Incineration Plant — Phase 3

Sector: Waste Processing and Treatment • Location: Macau, China

Source: Engineering News-Record

Project
Completed

The Macau Refuse Incineration Plant's Phase 3 expansion boosts daily waste handling capacity to over 3,000 tons at the only urban solid waste treatment facility in Macau. The project includes refuse receiving, charging and incineration systems; waste heat recovery; steam turbine power; water and steam cooling; flue gas cleaning; fly ash and slag handling; a new power substation; and a 25-ton-per-d

Project Information FAQ

Project Information

4 Q
The project “Macau Refuse Incineration Plant — Phase 3” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Macau, China. Taiyo aggregates data on it from Engineering News-Record.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Macau Refuse Incineration Plant's Phase 3 expansion boosts daily waste handling capacity to over 3,000 tons at the only urban solid waste treatment facility in Macau. The project includes refuse receiving, charging and incineration systems; waste heat recovery; steam turbine power; water and steam cooling; flue gas cleaning; fly ash and slag handling; a new power substation; and a 25-ton-per-day hazardous waste treatment plant. It allows for annual power generation of 200 million kWh at full capacity. The design reduces the bulk of the complex on a tight site using a stacked layout with photovoltaic glass curtain walls for natural light and ventilation, and incorporates sustainability features such as wastewater treatment and rooftop rainwater harvesting. The project was finished ahead of schedule and on budget.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data