logo
ProjectActive

MACCEM

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

 Mackie Building Materials (MBM or ‘the Company’) was established in Freetown, Sierra Leone in 1995, and is engaged in the sale of cement and steel, with an existing market share of 50% for cement. MBM’s sister company, MACCEM Industries Limited (‘MACCEM’), was established in 2019 to engage in the importation, production, and sale of bagged cement, also in Sierra Leone. MACCEM is planning the cons

Status
Prospective
Sector
Steel, Commercial, Airport, Road, Residential, Metal, Government
Location
Sierra Leone
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about MACCEM

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MACCEM” is an infrastructure initiative in the Steel sector, located in Sierra Leone. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Mackie Building Materials (MBM or ‘the Company’) was established in Freetown, Sierra Leone in 1995, and is engaged in the sale of cement and steel, with an existing market share of 50% for cement. MBM’s sister company, MACCEM Industries Limited (‘MACCEM’), was established in 2019 to engage in the importation, production, and sale of bagged cement, also in Sierra Leone. MACCEM is planning the construction of a ~560,000 tons per annum (tpa) capacity cement grinding plant in Hastings, Freetown (‘the Project’). The Project is located on a 10.9-acre site adjacent to the Hastings Airstrip and the Jui-Masiaka Highway in Waterloo Rural, Freetown. The nearest residential area is approximately 100m from the site. The site already contains MACCEM’s operational cement bagging plant, with civil works for the grinding plant underway. As of July 2024, site clearing, levelling and civils have been completed. The anticipated construction timeline for the remaining work is 12-15 months. Clinker for the grinding plant will be imported and transported via road to the site from the Queen Elizabeth II Quay at the Port of Freetown. IFC is considering a debt financing package of up to US$ 24 million to MBM for the construction of the project. MBM’s sister company, MACCEM, which will own the proposed grinding plant and will be a co-borrower of the IFC loan. The proposed financing package comprises an up to US$ 12 million IFC A loan and up to US$ 12 million International Development Association Private Sector Window Blended Finance Facility.

Original sector

H-AA - Cement

Location

Country

Sierra Leone

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Steel, Commercial, Airport, Road, Residential, Metal, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project