Macleod 2 Bridge Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project 1: MACLEOD #2 BRIDGE (INV083A), From 0.5km north of Trunk 30 on East Big Intervale Road northerly approximately 0.22km, approximately 0.22 kilometres TOTAL APPROXIMATELY ..0.22 kilometres BRIDGE CONSTRUCTION In general, work on this Contract involves design build structure and removal of existing structure. In addition clearing of highway, excavation of roadway and drainage common, gravel
- Status
- Closed
- Sector
- Commercial, Bridge, Road, Steel, Metal, Manufacturing (Industrial), Waste Processing and Treatment, Seaport
- Location
- Port Hawkesbury, Nova Scotia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Macleod 2 Bridge Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project 1: MACLEOD #2 BRIDGE (INV083A), From 0.5km north of Trunk 30 on East Big Intervale Road northerly approximately 0.22km, approximately 0.22 kilometres TOTAL APPROXIMATELY ..0.22 kilometres BRIDGE CONSTRUCTION In general, work on this Contract involves design build structure and removal of existing structure. In addition clearing of highway, excavation of roadway and drainage common, gravel borrow, gravelling, clear stone, armour rock, tack, asphalt primer, cold planing, install steel g... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Nova Scotia |
City | Port Hawkesbury |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Road, Steel, Metal, Manufacturing (Industrial), Waste Processing and Treatment, Seaport |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
