Macnaughton Reservoir and BPS Rechlorination System
Sector: Wind • Location: Exeter, Ontario, Canada
Source: Dodge USA
Upgrades of the existing MacNaughton Booster Pumping Station, Exeter, Ontario. The works include replacement of electrical equipment, new MCC, new vertical turbine recirculation pump, sodium hypochlorite dosing system, a reservoir discharge header and process piping modifications.
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT), Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Exeter, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Macnaughton Reservoir and BPS Rechlorination System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Upgrades of the existing MacNaughton Booster Pumping Station, Exeter, Ontario. The works include replacement of electrical equipment, new MCC, new vertical turbine recirculation pump, sodium hypochlorite dosing system, a reservoir discharge header and process piping modifications. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Exeter |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
