Macomb County Phase 3 Site Electrical Upgrades REBID
Closed · Michigan · Last reported Oct 2024
Source: Dodge USA
The project consists of: ELECTRICAL WORK INCLUDED: Demolition (Note: Refer to sheet E-1 for "Suggested Construction Sequence of Work" including power interruptions and temporary generator requirements.) 1. Disconnect, remove, and properly dispose two transformers inside Powerhouse. 2. Disconnect, remove, and properly dispose two diesel generators located in Powerhouse including control panels, pul
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Hospital, Government, Hotel
- Location
- Mount Clemens, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Macomb County Phase 3 Site Electrical Upgrades REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: ELECTRICAL WORK INCLUDED: Demolition (Note: Refer to sheet E-1 for "Suggested Construction Sequence of Work" including power interruptions and temporary generator requirements.) 1. Disconnect, remove, and properly dispose two transformers inside Powerhouse. 2. Disconnect, remove, and properly dispose two diesel generators located in Powerhouse including control panels, pull boxes, conduit/wiring, etc. entirely. 3. Disconnect and remove feeders associated with dampers ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Mount Clemens |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Hospital, Government, Hotel |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
