Madaba Uranium Project
One of 3,621 projects Taiyo tracks in Tanzania.
Source: Stockhead
The Madaba uranium project in Tanzania was recently acquired by QX Resources. The project is interpreted to be geologically akin to the Nyota project which hosts 125 million pounds of U3O8. Environmental impact assessment is expected to clear the path to drilling as soon as Q3 2026.
- Status
- Prospective
- Sector
- Nuclear
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- Stockhead
ConstructChat
Ask ConstructChat about Madaba Uranium Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | exploration |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Madaba uranium project in Tanzania was recently acquired by QX Resources. The project is interpreted to be geologically akin to the Nyota project which hosts 125 million pounds of U3O8. Environmental impact assessment is expected to clear the path to drilling as soon as Q3 2026. |
Original sector | Energy |
Location
Country | Tanzania |
Source
Source | Stockhead |
URL |
More Details
Record type | Project |
Sector | Nuclear |
Article published date | 2026-04-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Nuclear projects in Tanzania
- Tanzania - Iringa-Shinyanga Transmission Line Project
- Tanzania-Russia Joint Uranium Plant
- Mkuju River Uranium Project Main Plant Construction
- Mkuju River Uranium Processing Plant
- Pilot Uranium Processing Plant at Mkuju River Project
- Mkuju River Uranium Processing Pilot Plant
- TAZARA Railway
- Mkuju River Uranium Project
