logo
Project

Madagascar - Basse Betsiboka Rice Scheme Rehabilitation Project

Sector: Raw Materials • Location: Madagascar

Source: African Development Bank (AfDB)

The Basse Betsiboka Rice Scheme Rehabilitation Project is designed to contribute to the Malagasy Government's objective of achieving self-sufficiency in rice by 1990. The project should restore the region's productive potential by rehabilitating and recovering poorly irrigated or non-irrigated areas and by mobilizing and using water resources wisely on the one hand and restoring the environmental

Sector
Raw Materials, Water Supply and Storage, Hydro, Consumer Products, Waste Processing and Treatment, Government
Location
Madagascar
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Madagascar - Basse Betsiboka Rice Scheme Rehabilitation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Madagascar - Basse Betsiboka Rice Scheme Rehabilitation Project” is an infrastructure initiative in the Raw Materials sector, located in Madagascar. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Basse Betsiboka Rice Scheme Rehabilitation Project is designed to contribute to the Malagasy Government's objective of achieving self-sufficiency in rice by 1990. The project should restore the region's productive potential by rehabilitating and recovering poorly irrigated or non-irrigated areas and by mobilizing and using water resources wisely on the one hand and restoring the environmental balance through short, medium and long-term actions on the other. At the local level, it also contributes to increasing the surpluses traded in Mahajanga province and thereby reducing rice import expenditures. The project consists of: a) rehabilitation of the irrigation and drainage networks of 2 priority perimeters on the left bank of Betsiboka; (b) extension of the Bekarara and Karambo Basse perimeters on the right bank of Betsiboka; c) increasing the capacity (12.8 million m3) of two dams; d) the interconnections of the Bekarara and Karambo Basse networks; e) connection of the Milahazomaty network to the Andranomandevy spring and the installation of a sand trap on the Milahazomaty river; f) conservation and restoration of water and soil on the 4 priority watersheds; (g) creation within the project unit of a monitoring and evaluation unit; (h) establishment of a research and development and training program coupled with pilot sensitization activities for beneficiaries and (i) carrying out of specific studies related to the proposed project, to help achieve of its objectives. The main components of the project are: A) Hydro-agricultural infrastructure; B) Soil water conservation; C) Miscellaneous equipment; D) Engineering; E) Research-Development-Training; F) Monitoring and evaluation; G) Operations and H) Local staff.

Original sector

Agriculture, Forestry, Fishing

Budget

Location

Country

Madagascar

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Water Supply and Storage, Hydro, Consumer Products, Waste Processing and Treatment, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project