logo

Madagascar - Basse Betsiboka Rice Scheme Rehabilitation Project

Sector: Raw Materials • Location: Madagascar

Source: African Development Bank (AfDB)

Project

The Basse Betsiboka Rice Scheme Rehabilitation Project is designed to contribute to the Malagasy Government's objective of achieving self-sufficiency in rice by 1990. The project should restore the region's productive potential by rehabilitating and recovering poorly irrigated or non-irrigated areas and by mobilizing and using water resources wisely on the one hand and restoring the environmental

Project Information FAQ

Project Information

4 Q
The project “Madagascar - Basse Betsiboka Rice Scheme Rehabilitation Project” is an infrastructure initiative in the Raw Materials sector, located in Madagascar. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Basse Betsiboka Rice Scheme Rehabilitation Project is designed to contribute to the Malagasy Government's objective of achieving self-sufficiency in rice by 1990. The project should restore the region's productive potential by rehabilitating and recovering poorly irrigated or non-irrigated areas and by mobilizing and using water resources wisely on the one hand and restoring the environmental balance through short, medium and long-term actions on the other. At the local level, it also contributes to increasing the surpluses traded in Mahajanga province and thereby reducing rice import expenditures. The project consists of: a) rehabilitation of the irrigation and drainage networks of 2 priority perimeters on the left bank of Betsiboka; (b) extension of the Bekarara and Karambo Basse perimeters on the right bank of Betsiboka; c) increasing the capacity (12.8 million m3) of two dams; d) the interconnections of the Bekarara and Karambo Basse networks; e) connection of the Milahazomaty network to the Andranomandevy spring and the installation of a sand trap on the Milahazomaty river; f) conservation and restoration of water and soil on the 4 priority watersheds; (g) creation within the project unit of a monitoring and evaluation unit; (h) establishment of a research and development and training program coupled with pilot sensitization activities for beneficiaries and (i) carrying out of specific studies related to the proposed project, to help achieve of its objectives. The main components of the project are: A) Hydro-agricultural infrastructure; B) Soil water conservation; C) Miscellaneous equipment; D) Engineering; E) Research-Development-Training; F) Monitoring and evaluation; G) Operations and H) Local staff.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data