Project

The Power Transmission Network Reinforcement and Interconnection Project in MadagascarPhase 2 (PRIRTEM-II) will help to reduce the power deficit of the Antananarivo interconnected network (RIA) through the integration of new power plants, including Sahofika with a capacity of 192 MW and an output of nearly 1,500 GWh per year. Indeed, Madagascar has a huge but under-developed renewable energy poten

Project Information FAQ

Project Information

4 Q
The project “Madagascar - Power Transmission Network Reinforcement and Interconnection Project in Madagascar - Phase II (PRIRTEM-II)” is an infrastructure initiative in the Commercial sector, located in Madagascar. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Power Transmission Network Reinforcement and Interconnection Project in MadagascarPhase 2 (PRIRTEM-II) will help to reduce the power deficit of the Antananarivo interconnected network (RIA) through the integration of new power plants, including Sahofika with a capacity of 192 MW and an output of nearly 1,500 GWh per year. Indeed, Madagascar has a huge but under-developed renewable energy potential. Less than 3% of the country’s hydropower potential (7,800 MW) is untapped. The project comprises: (i) the construction of a 135 km, 220 kV double-circuit interconnection line, with a capacity of 300 MW, between the Tana Sud 3 (TS3) and Vinaninkarena substations, via the Antanifotsy substation; (ii) the construction of the TS3 220/90/20 kV and Vinaninkarena 220/63/20 kV transformer substations; and (iii) the electrification of 19 villages in the Soanindrariny, Ambohidranandriana, Ambatomena and Ambohimiarivo municipal councils, representing 1,000 households. The expected outcomes of this investment operation are as follows: (i) increase in the coverage of the country's interconnected power grid; (ii) integration of major hydropower production facilities, in particular the future Sahofika power plant (192 MW); (iii) reduction of the harmful effects of fossil fuel-based power production on the environment; (iv) improved electricity access to the country and especially in the project area; and (v) job creation, knowledge transfer and capacity building for the power sector staff and particularly JIRAMA employees. The project is estimated to cost UA 83.982 million and will be implemented over 60 months (2021-2025).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data