logo

Madagascar - Sahofika – Equity Participation in the Capital of the NEHO (Nouvelle Energie Hydroélectrique de l'Onive)

Sector: Raw Materials • Location: Madagascar

Source: African Development Bank (AfDB)

Project

The present intervention relates to the Sahofika Republic of Madagascar Equity Participation Project. It’s an ancillary project in support of the Sahofika Hydro Power Plant project, a 205 MW greenfield hydropower plant development which the Bank is supporting through three separate interventions. It entails the acquisition by the GoM of newly issued shares to the tune of EUR 30 million in the Spec

Project Information FAQ

Project Information

4 Q
The project “Madagascar - Sahofika – Equity Participation in the Capital of the NEHO (Nouvelle Energie Hydroélectrique de l'Onive)” is an infrastructure initiative in the Raw Materials sector, located in Madagascar. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present intervention relates to the Sahofika Republic of Madagascar Equity Participation Project. It’s an ancillary project in support of the Sahofika Hydro Power Plant project, a 205 MW greenfield hydropower plant development which the Bank is supporting through three separate interventions. It entails the acquisition by the GoM of newly issued shares to the tune of EUR 30 million in the Special Purpose Vehicle (SPV) implementing and operating the Sahofika HPP project. The investment, equivalent to an approximate 10-15% of shareholding, will be used to fund part of the project costs of the Sahofika HPP Project. The Sahofika HPP Project comprises the following main facilities: (i) a main RCC dam of 60m height comprising a water intake, an ungated upper spillway, a gated bottom outlet and an ecologic flow; (ii) a backfill saddle dam of 35 m height and 150m length; (iii) a 4,470m underground tunnel including a vertical surge chamber and two 1,800m long and 2.2m diameter penstocks; (iv) a surface powerhouse with an installed power capacity of 205MW comprising of 6 Pelton turbines and a switchyard; (v) a camp site comprising construction facilities and a permanent Operation and Maintenance (O&M) camp site; (vi) internal roads connecting facilities. The project has two main components, namely: (1) acquisition by the Crown of a 15% equity interest in NEHO, and (2) project management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data