Madagascar - Sahofika 192 MW Hydropower Project Partial Risk Guarantee
Sector: Water Supply and Storage • Location: Madagascar
Source: African Development Bank (AfDB)
This Sahofika 192 MW Hydropower Project Partial Risk Guarantee aims to provide a partial guarantee of the risk of non-payment by JIRAMA. The Sahofika Project consists of the design, construction and operation of a 200 MW hydroelectric power plant on the Onive River, 100 km southeast of Antananarivo (Madagascar). Hydraulic and civil engineering works will eventually increase the capacity to 300 MW.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This Sahofika 192 MW Hydropower Project Partial Risk Guarantee aims to provide a partial guarantee of the risk of non-payment by JIRAMA. The Sahofika Project consists of the design, construction and operation of a 200 MW hydroelectric power plant on the Onive River, 100 km southeast of Antananarivo (Madagascar). Hydraulic and civil engineering works will eventually increase the capacity to 300 MW. The project also includes the construction of a 63 km transmission line between Antananifotsy and the site, a camp near the power plant, and 6 km of access roads. Construction is expected to take five years. It is expected to produce approximately 1,570 GWh per year. The power plant guarantees a base load capacity of 192 MW (95%), including during the dry season. However, the civil works are designed to allow for an extension to about 300 MW at lower cost. The project is being developed under a Build-Operate-Own-Transfer (BOOT) contract which provides for the design, financing, construction, operation and management of the hydroelectric plant under a 35-year concession agreement and a Power Purchase Agreement (PPA). The concession agreement will be concluded between the project company - Nouvelle énergie hydroélectrique de l'Onive (NEHO or the project company) - and the Malagasy State represented by the Ministry of Water, Energy and Hydrocarbons, while the PPA will be signed between the National Water and Electricity Company of Madagascar (JIRAMA) and NEHO. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
