logo
Project

Madagascar - Sahofika 192 MW Hydropower Project Partial Risk Guarantee

Sector: Water Supply and Storage • Location: Madagascar

Source: African Development Bank (AfDB)

This Sahofika 192 MW Hydropower Project Partial Risk Guarantee aims to provide a partial guarantee of the risk of non-payment by JIRAMA. The Sahofika Project consists of the design, construction and operation of a 200 MW hydroelectric power plant on the Onive River, 100 km southeast of Antananarivo (Madagascar). Hydraulic and civil engineering works will eventually increase the capacity to 300 MW.

Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Road, Government
Location
Madagascar
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Madagascar - Sahofika 192 MW Hydropower Project Partial Risk Guarantee

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Madagascar - Sahofika 192 MW Hydropower Project Partial Risk Guarantee” is an infrastructure initiative in the Water Supply and Storage sector, located in Madagascar. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This Sahofika 192 MW Hydropower Project Partial Risk Guarantee aims to provide a partial guarantee of the risk of non-payment by JIRAMA. The Sahofika Project consists of the design, construction and operation of a 200 MW hydroelectric power plant on the Onive River, 100 km southeast of Antananarivo (Madagascar). Hydraulic and civil engineering works will eventually increase the capacity to 300 MW. The project also includes the construction of a 63 km transmission line between Antananifotsy and the site, a camp near the power plant, and 6 km of access roads. Construction is expected to take five years. It is expected to produce approximately 1,570 GWh per year. The power plant guarantees a base load capacity of 192 MW (95%), including during the dry season. However, the civil works are designed to allow for an extension to about 300 MW at lower cost. The project is being developed under a Build-Operate-Own-Transfer (BOOT) contract which provides for the design, financing, construction, operation and management of the hydroelectric plant under a 35-year concession agreement and a Power Purchase Agreement (PPA). The concession agreement will be concluded between the project company - Nouvelle énergie hydroélectrique de l'Onive (NEHO or the project company) - and the Malagasy State represented by the Ministry of Water, Energy and Hydrocarbons, while the PPA will be signed between the National Water and Electricity Company of Madagascar (JIRAMA) and NEHO.

Original sector

Energy

Budget

Location

Country

Madagascar

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project