Madagascar - Sahofika 192 MW Hydropower Project Partial Risk Guarantee

Sector: Water Supply and Storage • Location: Madagascar

Source: African Development Bank (AfDB)

Project

This Sahofika 192 MW Hydropower Project Partial Risk Guarantee aims to provide a partial guarantee of the risk of non-payment by JIRAMA. The Sahofika Project consists of the design, construction and operation of a 200 MW hydroelectric power plant on the Onive River, 100 km southeast of Antananarivo (Madagascar). Hydraulic and civil engineering works will eventually increase the capacity to 300 MW.

Project Information FAQ

Project Information

4 Q
The project “Madagascar - Sahofika 192 MW Hydropower Project Partial Risk Guarantee” is an infrastructure initiative in the Water Supply and Storage sector, located in Madagascar. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This Sahofika 192 MW Hydropower Project Partial Risk Guarantee aims to provide a partial guarantee of the risk of non-payment by JIRAMA. The Sahofika Project consists of the design, construction and operation of a 200 MW hydroelectric power plant on the Onive River, 100 km southeast of Antananarivo (Madagascar). Hydraulic and civil engineering works will eventually increase the capacity to 300 MW. The project also includes the construction of a 63 km transmission line between Antananifotsy and the site, a camp near the power plant, and 6 km of access roads. Construction is expected to take five years. It is expected to produce approximately 1,570 GWh per year. The power plant guarantees a base load capacity of 192 MW (95%), including during the dry season. However, the civil works are designed to allow for an extension to about 300 MW at lower cost. The project is being developed under a Build-Operate-Own-Transfer (BOOT) contract which provides for the design, financing, construction, operation and management of the hydroelectric plant under a 35-year concession agreement and a Power Purchase Agreement (PPA). The concession agreement will be concluded between the project company - Nouvelle énergie hydroélectrique de l'Onive (NEHO or the project company) - and the Malagasy State represented by the Ministry of Water, Energy and Hydrocarbons, while the PPA will be signed between the National Water and Electricity Company of Madagascar (JIRAMA) and NEHO.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data