Madhya Ganga canal Phase-II

Sector: Water Supply and Storage • Location: Bijnor, Uttar Pradesh, India

Source: India Investment Grid (IIG)

Information Irrigation & Water Resources-UP has come up with Madhya Ganga canal Phase-II with a ticket size of 4417.21 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritiz

Status
Closed
Sector
Water Supply and Storage, Road, Government
Location
Bijnor, Uttar Pradesh, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Madhya Ganga canal Phase-II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Madhya Ganga canal Phase-II” is an infrastructure initiative in the Water Supply and Storage sector, located in Bijnor, Uttar Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Irrigation & Water Resources-UP has come up with Madhya Ganga canal Phase-II with a ticket size of 4417.21 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion. It envisages construction of followings. [i] Head regulator is situated on left bank head regulator with three openings of size 8m X 5.7m with sill level at EL 217.00m has already been constructed earlier along with Madhya Ganga Canal, Bijnor. [ii] Main canal is 66.2 km long has been designed as c c tile lned lined with 147 cumecs discharge capacity up to silt ejector and 121.8 cumecs beyond it. [iii] Bahjoi Branch canal is 50.800 km long unlined branch canal designed to carry 60.00 cumec discharge at head for catering to demand of 115845 ha culturable command area. [iv] Chandausi Branch Canal is 60km long unlined branch canal designed to carry 42.60 cumec discharge at head for catering to demand of 79427 ha culturable command area. [v] Distribution system is 1065.00 km long distribution system comprising unlined major and minor distributaries. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 3277.97 crore Eligible Central Assistance was Rs 92.00 crore CA released since 2016 till march 2023 is 63.80 crore State Share released through NABARD under LTIF till march is Rs crore Physical progress 93.00 percentage Financial Progress 99.00 percentage Ultimate Irrigation Potential is 146530 Ha Irrigation Potential created till march 2023 is 124000 Ha Projected Date of Completion December 2023

Original sector

Water Resources

Procurement method

Budget

Location

Country

India

State

Uttar Pradesh

City

Bijnor

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project