logo

Madison Well No. 12 Well Facility

Sector: Water Supply and Storage • Location: Fitchburg, Wisconsin, United States of America

Source: Dodge

Project
Closed

Project consists of construction of a new well facility with pump room, two chemical rooms, a generator room, and two bathrooms; modifying the pressure relief valve at the Swan Creek PRV Station; removing the hydropneumatics pressure tank and modifying the chemical injection location at Well No. 7; modifying the automated controls for Well Nos. 10 and 11; and replacing the remote monitoring equipm

Status
Closed
Sector
Water Supply and Storage, Government, Chemical (Industrial), Power Transmission, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Power Generation (CCGT)
Location
Fitchburg, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Madison Well No. 12 Well Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Madison Well No. 12 Well Facility” is an infrastructure initiative in the Water Supply and Storage sector, located in Fitchburg, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project consists of construction of a new well facility with pump room, two chemical rooms, a generator room, and two bathrooms; modifying the pressure relief valve at the Swan Creek PRV Station; removing the hydropneumatics pressure tank and modifying the chemical injection location at Well No. 7; modifying the automated controls for Well Nos. 10 and 11; and replacing the remote monitoring equipment controllers and radios at up to twelve water utility facilities.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Fitchburg

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Chemical (Industrial), Power Transmission, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Power Generation (CCGT)

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project