logo

MA/DOT: Beverly Temporary Bridge Construction

Sector: Bridge • Location: Beverly, Massachusetts, United States of America

Source: Dodge

Project
Closed

Description: Temporary Bridge Construction, B-11-001, Bridge Street over Bass River (Hall-Whitaker Drawbridge)

Status
Closed
Sector
Bridge, Commercial, Road
Location
Beverly, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about MA/DOT: Beverly Temporary Bridge Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MA/DOT: Beverly Temporary Bridge Construction” is an infrastructure initiative in the Bridge sector, located in Beverly, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Description: Temporary Bridge Construction, B-11-001, Bridge Street over Bass River (Hall-Whitaker Drawbridge)

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Beverly

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Commercial, Road

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project