logo
ProjectPlanning Schematics

MA/DOT: Bike Path Bridge Construction

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

GARDNER- BIKE PATH BRIDGE CONSTRUCTION, NORTH CENTRAL PATHWAY OVER ROUTE 140 . The project involves construction of a bike path bridge over Route 140. The new bridge is along a modified alignment of the North Central Pathway. The new bridge will provide a grade separated crossing, linking the existing bike path to a section of bike path to be built on a utility easement by the City. When this segm

Status
Prospective
Sector
Bridge, Commercial, Power Transmission, Road, Power Generation (CCGT)
Location
Gardner, Massachusetts, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MA/DOT: Bike Path Bridge Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MA/DOT: Bike Path Bridge Construction” is an infrastructure initiative in the Bridge sector, located in Gardner, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

GARDNER- BIKE PATH BRIDGE CONSTRUCTION, NORTH CENTRAL PATHWAY OVER ROUTE 140 . The project involves construction of a bike path bridge over Route 140. The new bridge is along a modified alignment of the North Central Pathway. The new bridge will provide a grade separated crossing, linking the existing bike path to a section of bike path to be built on a utility easement by the City. When this segment is completed it will provide full connection between downtown Gardner and the center of Westm...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Gardner

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Commercial, Power Transmission, Road, Power Generation (CCGT)

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project