MA/DOT: (Boxford) Route 133 (Washington St) Reconstruction
Sector: Water Supply and Storage • Location: Gloucester, Massachusetts, United States of America
Source: Dodge USA
Boxford- Reconstruction On Route 133 (Washington Street) From The NorthAndover Tl To Main Street - The project will reconstruct Route 133 (Washington Street) from the North Andover town line to Main Street, approximately 1.45 miles. The project will widen the existing pavementwidth to 30 feet to include two 11-foot lanes and two four-foot shared bicycle/pedestrian lanes and reconfigure three inter
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Rail, Commercial, Road, Mass Transit, Car parking, Automotive
- Location
- Gloucester, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MA/DOT: (Boxford) Route 133 (Washington St) Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Boxford- Reconstruction On Route 133 (Washington Street) From The NorthAndover Tl To Main Street - The project will reconstruct Route 133 (Washington Street) from the North Andover town line to Main Street, approximately 1.45 miles. The project will widen the existing pavementwidth to 30 feet to include two 11-foot lanes and two four-foot shared bicycle/pedestrian lanes and reconfigure three intersections to “T” type intersections. These are Washington Street at Main Street, at Essex Road... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Gloucester |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Rail, Commercial, Road, Mass Transit, Car parking, Automotive |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
