logo

MA/DOT: Bridge Rehabilitation

Sector: Bridge • Location: West Springfield, Massachusetts, United States of America

Source: Dodge USA

Project
Planning Schematics

The scope of the project includes a feasibility study of possible rehabilitation options for Bridge No. W-21-027, AKA Route 5 Tunnel, carrying Route 20 (Park Ave.) over Route 5. The existing structure wasbuilt in 1952

Status
Prospective
Sector
Bridge, Car parking, Road, Tunnel, Automotive, Commercial
Location
West Springfield, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MA/DOT: Bridge Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MA/DOT: Bridge Rehabilitation” is an infrastructure initiative in the Bridge sector, located in West Springfield, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of the project includes a feasibility study of possible rehabilitation options for Bridge No. W-21-027, AKA Route 5 Tunnel, carrying Route 20 (Park Ave.) over Route 5. The existing structure wasbuilt in 1952

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

West Springfield

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Car parking, Road, Tunnel, Automotive, Commercial

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project