logo
ProjectPlanning Schematics

MA/DOT: Bridge Replacement

Planning schematics · Massachusetts · Last reported Dec 2024

Source: Dodge USA

MONSON- BRIDGE REPLACEMENT, M-27-030 (68H), BUNYAN ROAD OVER CHICOPEE BROOK, This project will consist of a full bridge replacement at the Bunyan Road bridge over the Chicopee Brook in the town of Monson. The bridge span will likely be increased and/or raised for hydraulics.

Status
Prospective
Sector
Road, Bridge, Commercial
Location
Monson, Massachusetts, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MA/DOT: Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MA/DOT: Bridge Replacement” is an infrastructure initiative in the Road sector, located in Monson, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

MONSON- BRIDGE REPLACEMENT, M-27-030 (68H), BUNYAN ROAD OVER CHICOPEE BROOK, This project will consist of a full bridge replacement at the Bunyan Road bridge over the Chicopee Brook in the town of Monson. The bridge span will likely be increased and/or raised for hydraulics.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Monson

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Bridge, Commercial

Article published date

2024-12-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project