MA/DOT: District 4 Accessibility Improvements
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge
DISTRICT 4- ACCESSIBILITY IMPROVEMENTS AT MULTIPLE LOCATIONS (CENTRAL PROJECT) , The purpose of this project is to reconstruct and upgrade all deficient pedestrian curb ramps to full ADA compliance at four locations. The first location is in Lowell at the intersection of Woburn Street and Grafton Street. The second location is in Methuen at the intersection of Route 113 (Pleasant Street) and the R
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Road, Commercial
- Location
- Lowell, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MA/DOT: District 4 Accessibility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | DISTRICT 4- ACCESSIBILITY IMPROVEMENTS AT MULTIPLE LOCATIONS (CENTRAL PROJECT) , The purpose of this project is to reconstruct and upgrade all deficient pedestrian curb ramps to full ADA compliance at four locations. The first location is in Lowell at the intersection of Woburn Street and Grafton Street. The second location is in Methuen at the intersection of Route 113 (Pleasant Street) and the Route 213 Loop Connector Exit 3 on and off-ramps. The third location is in Lowell is located at th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Lowell |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
