MA/DOT: District 6- Sidewalk Repair
Sector: Car parking • Location: Massachusetts, United States of America
Source: Dodge USA
Project Description: DISTRICT 6- SIDEWALK REPAIR AT VARIOUS LOCATIONS Location: Design Responsibility: In-House Boston Right of Way Responsibility: MassDOT Construction Begins: Spring 2025 Project Manager: Sasha BergEmail MassHighway Estimated Total Contract Cost: $1,400,000.00 Estimated Total Federal Participating Construction Cost: N/A District: District 6 Current Status: This project is in the
- Status
- Prospective
- Sector
- Car parking, Automotive, Commercial
- Location
- Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MA/DOT: District 6- Sidewalk Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description: DISTRICT 6- SIDEWALK REPAIR AT VARIOUS LOCATIONS Location: Design Responsibility: In-House Boston Right of Way Responsibility: MassDOT Construction Begins: Spring 2025 Project Manager: Sasha BergEmail MassHighway Estimated Total Contract Cost: $1,400,000.00 Estimated Total Federal Participating Construction Cost: N/A District: District 6 Current Status: This project is in the preliminary design phase. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
