MA/DOT: (Franklin) Route 140 Intersection Improvements
Planning schematics · Massachusetts · Last reported Dec 2024
Source: Dodge USA
Franklin- Resurfacing & Intersection Improvements On Route 140, From Beaver Street To I-495 Ramps - The proposed project involves pavement rehabilitation from Beaver Street to 300 feet south of the I-495 ramps, a distance of approximately 0.5 miles. The improvements also include upgrades to the existing signals at Beaver Street and Panther Way
- Status
- Prospective
- Sector
- Commercial, Mass Transit, Rail, Road
- Location
- Franklin, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MA/DOT: (Franklin) Route 140 Intersection Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Franklin- Resurfacing & Intersection Improvements On Route 140, From Beaver Street To I-495 Ramps - The proposed project involves pavement rehabilitation from Beaver Street to 300 feet south of the I-495 ramps, a distance of approximately 0.5 miles. The improvements also include upgrades to the existing signals at Beaver Street and Panther Way |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Franklin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Mass Transit, Rail, Road |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
