MA/DOT: Gallivan Boulevard Route 203 Safety Improvements
Sector: Road • Location: Boston, Massachusetts, United States of America
Source: Dodge USA
BOSTON- SAFETY IMPROVEMENTS ON GALLIVAN BOULEVARD (ROUTE 203), FROM WASHINGTON STREET TO GRANITE AVENUE MassDOT is proposing to improve safety between the intersection of Gallivan Boulevard at Washington Street and Gallivan Boulevard at Granite Avenue/Adams Street. The design will be based on the future road safety audit (RSA) to take place throughout the project limits. These recommendations will
- Status
- Prospective
- Sector
- Road, Mass Transit, Rail, Commercial
- Location
- Boston, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MA/DOT: Gallivan Boulevard Route 203 Safety Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BOSTON- SAFETY IMPROVEMENTS ON GALLIVAN BOULEVARD (ROUTE 203), FROM WASHINGTON STREET TO GRANITE AVENUE MassDOT is proposing to improve safety between the intersection of Gallivan Boulevard at Washington Street and Gallivan Boulevard at Granite Avenue/Adams Street. The design will be based on the future road safety audit (RSA) to take place throughout the project limits. These recommendations will likely improve curb ramps, cross walks, traffic signals, pavement markings, signage, etc. The pr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Mass Transit, Rail, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
