MA/DOT: Perry Hill Road Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
WESTHAMPTON- BRIDGE MAINTENANCE, W-27-028, PERRY HILL ROAD OVER NORTH BROOK OF MANHAN RIVER. Replacement of the bridge carrying Perry Hill Road over the North Branch of the Manhan River. Related work includes approach roadway modifications and drainage improvements.
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Commercial
- Location
- Westhampton, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MA/DOT: Perry Hill Road Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | WESTHAMPTON- BRIDGE MAINTENANCE, W-27-028, PERRY HILL ROAD OVER NORTH BROOK OF MANHAN RIVER. Replacement of the bridge carrying Perry Hill Road over the North Branch of the Manhan River. Related work includes approach roadway modifications and drainage improvements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Westhampton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Commercial |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
