MA/DOT: Route 32 Reconstruction Improvement
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge
PALMER- RECONSTRUCTION OF ROUTE 32 (WARE ROAD) FROM JUST SOUTH OF STIMSON STREET TO WARE T.L. (4.0 MILES) The proposed project consists of the reconstruction of a section of State Route 32 (also known as Ware Road) from just south of Stimson Street in Palmer northerly approximately 3.73 miles to the Ware town line. Intersection and approach improvements will be made at Stimson Street, Gates Street
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Commercial
- Location
- Palmer, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MA/DOT: Route 32 Reconstruction Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | PALMER- RECONSTRUCTION OF ROUTE 32 (WARE ROAD) FROM JUST SOUTH OF STIMSON STREET TO WARE T.L. (4.0 MILES) The proposed project consists of the reconstruction of a section of State Route 32 (also known as Ware Road) from just south of Stimson Street in Palmer northerly approximately 3.73 miles to the Ware town line. Intersection and approach improvements will be made at Stimson Street, Gates Street, River Street, and Rondeau Street. The roadway will have a cross-section of 36-feet with two 12 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Palmer |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
