MA/DOT: Silver Line Extension
Pre-design · Massachusetts · Last reported Jul 2025
Source: Dodge
Transportation and the MBTA say an internal analysis by the two agencies recommends extending the Silver Line 3 bus to intersect with the Orange Line at Sullivan Square, a project that would cost an estimated $95 million and increase daily ridership by 15,000. The SL3 currently starts at South Station and terminates at Chelsea station. The route started running in 2018 and makes stops in Seaport,
- Status
- Prospective
- Sector
- Consumer Products, Airport, Road, Commercial, Seaport
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MA/DOT: Silver Line Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Transportation and the MBTA say an internal analysis by the two agencies recommends extending the Silver Line 3 bus to intersect with the Orange Line at Sullivan Square, a project that would cost an estimated $95 million and increase daily ridership by 15,000. The SL3 currently starts at South Station and terminates at Chelsea station. The route started running in 2018 and makes stops in Seaport, East Boston, and Boston Logan International Airport. In 2021, MassDOT and the MBTA began working ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Airport, Road, Commercial, Seaport |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
