MA/DOT: Tunnel Preservation
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge
BOSTON- TUNNEL PRESERVATION, INSTALLATION AND REPLACEMENT OF SUMP PUMPS AT MHS TUNNELS The work under this project will consist of the installation and replacement of sump pumps within the MHS tunnel system on a priority basis.
- Status
- Prospective
- Sector
- Water Supply and Storage, Automotive, Waste Processing and Treatment, Road, Commercial, Tunnel
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MA/DOT: Tunnel Preservation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | BOSTON- TUNNEL PRESERVATION, INSTALLATION AND REPLACEMENT OF SUMP PUMPS AT MHS TUNNELS The work under this project will consist of the installation and replacement of sump pumps within the MHS tunnel system on a priority basis. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Automotive, Waste Processing and Treatment, Road, Commercial, Tunnel |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
