logo
ProjectPlanning Schematics

MA/DOT: Various Locations Scheduled and Emergency Structural

One of 9,133 projects Taiyo tracks in Maine.

Source: Dodge USA

Project Description: DISTRICT 4- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS (INCLUDING PAINTING) AT VARIOUS LOCATIONS Location: Design Responsibility: In-House Boston Right of Way Responsibility: MassDOT Construction Begins: Autumn 2025 Project Manager: Genesis Poz DiazEmail MassHighway Estimated Total Contract Cost: $3,000,000.00 Estimated Total Federal Participating Construction Cost: N/A Distri

Status
Prospective
Sector
Bridge, Road, Commercial
Location
Lyman, Maine, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MA/DOT: Various Locations Scheduled and Emergency Structural

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MA/DOT: Various Locations Scheduled and Emergency Structural” is an infrastructure initiative in the Bridge sector, located in Lyman, Maine, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Description: DISTRICT 4- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS (INCLUDING PAINTING) AT VARIOUS LOCATIONS Location: Design Responsibility: In-House Boston Right of Way Responsibility: MassDOT Construction Begins: Autumn 2025 Project Manager: Genesis Poz DiazEmail MassHighway Estimated Total Contract Cost: $3,000,000.00 Estimated Total Federal Participating Construction Cost: N/A District: District 4 Current Status: This project is in the preliminary design phase.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maine

City

Lyman

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Commercial

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project