Madrid Sur Data Centre
One of 10,000+ projects Taiyo tracks in Spain.
Source: SolarQuarter
Madrid Sur is the first project of the joint venture between Iberdrola and Echelon Data Centres. It is a 160,000 m² facility with 144 MW of data processing capacity and a secured 230 MW grid connection. The centre will be powered by an on-site solar photovoltaic plant and additional clean energy from Iberdrola, requiring 1 TWh of electricity annually. It is expected to become operational before 20
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Data Center
- Location
- Madrid, Spain
- Updated
- 22 Jul 2026
- Source
- SolarQuarter
ConstructChat
Ask ConstructChat about Madrid Sur Data Centre
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Madrid Sur is the first project of the joint venture between Iberdrola and Echelon Data Centres. It is a 160,000 m² facility with 144 MW of data processing capacity and a secured 230 MW grid connection. The centre will be powered by an on-site solar photovoltaic plant and additional clean energy from Iberdrola, requiring 1 TWh of electricity annually. It is expected to become operational before 2030 and generate approximately 1,500 jobs. |
Original sector | Energy and Data Centre |
Location
Country | Spain |
City | Madrid |
Source
Source | SolarQuarter |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Data Center |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
