Madsen Mine Shaft Renovation Project
Sector: Mining • Location: Red Lake, Ontario, Canada
Source: Crux Investor
A three-stage shaft renovation plan at the Madsen Mine to add 300-400 tonnes per day material movement capacity by year-end 2025. The first stage includes equipment procurement and infrastructure preparation such as new hoist rope, a 5-tonne skip, and scrolls, along with loading pocket preparation at 550 metres depth.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A three-stage shaft renovation plan at the Madsen Mine to add 300-400 tonnes per day material movement capacity by year-end 2025. The first stage includes equipment procurement and infrastructure preparation such as new hoist rope, a 5-tonne skip, and scrolls, along with loading pocket preparation at 550 metres depth. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
