logo

MAE MOH LIGNITE II

Sector: Road • Location: Thailand

Source: World Bank Group

Project
Closed

The Second Mae Moh Lignite Project is a second-stage expansion of the Mae Moh open-pit lignite mine to increase production capacity from 2.8 to about 5.0 million tonnes per year. The project forms part of a long-term national development strategy to develop indigenous energy resources to reduce dependence on oil imports. The proposed expansion in lignite production is needed to increase lignite-fi

Project Information FAQ

Project Information

5 Q
The project “MAE MOH LIGNITE II” is an infrastructure initiative in the Road sector, located in Thailand. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Second Mae Moh Lignite Project is a second-stage expansion of the Mae Moh open-pit lignite mine to increase production capacity from 2.8 to about 5.0 million tonnes per year. The project forms part of a long-term national development strategy to develop indigenous energy resources to reduce dependence on oil imports. The proposed expansion in lignite production is needed to increase lignite-fired power generation at Mae Moh from 375 MW to 825 MW. The proposed project would reinforce economic pricing policies for lignite (studied under the earlier lignite project) to ensure that planned lignite expansions are economically and financially justified, and that EGAT's lignite mining operations are viable. It would further strengthen the operations both technically and financially through technical assistance, and assist in minimizing adverse enviromental effects of the mine. The project scope includes the engineering, procurement and erection of mining and related equipment (mainly conveyor belts, semi-mobile crushers, off-highway trucks, and auxiliary equipment), technical assistance, training and civil works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data