logo

MAEC Currimao Solar Plant

Sector: Solar • Location: Philippines

Source: World Bank Group

Project
Active

Mirae Asia Energy Corporation (MAEC), from South Korea, was developing the 20MW Currimao solar plant, in ILocos Norte Province. The plant was expected to generate 30 GWh annually, and consist of 60 hectares of land.

The project started construction in November 2012 and was expected for commissioning in May 2014. An MOU with the local government was signed in October 2011. Construction was expecte

Status
Prospective
Sector
Solar, Power Generation (CCGT), Government, Commercial
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about MAEC Currimao Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MAEC Currimao Solar Plant” is an infrastructure initiative in the Solar sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Mirae Asia Energy Corporation (MAEC), from South Korea, was developing the 20MW Currimao solar plant, in ILocos Norte Province. The plant was expected to generate 30 GWh annually, and consist of 60 hectares of land. The project started construction in November 2012 and was expected for commissioning in May 2014. An MOU with the local government was signed in October 2011. Construction was expected to take 18 months. The site was considered favorable due to relatively little rainfall. Total project cost was P2.4 billion (US$59 million). Debt funding was expected to come from both local and foreign banks. No furhter information was available, therefore listed here as under development. http://www.abs-cbnnews.com/nation/regions/11/16/12/korean-firm-build-solar-power-plant-ilocos-norte http://www.malaya.com.ph/index.php/business/business-news/19863-mirae-asia-starts-building-p2b-solar-plant

Original sector

Energy

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Government, Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project