logo

MAGAT IRR II

Sector: Road • Location: Philippines

Source: World Bank Group

Project
Closed

The Second Magat River Multipurpose Project is Package II of the Magat River Multipurpose Project Stage II which consists of the following four packages: Package I - consisting of preconstruction works (access roads, permanent camp, etc.), dam foundation grounding, drainage gallery tunneling and the river diversion tunnels, together with consulting services associated with these activities. Packag

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Raw Materials, Government
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about MAGAT IRR II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MAGAT IRR II” is an infrastructure initiative in the Road sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Second Magat River Multipurpose Project is Package II of the Magat River Multipurpose Project Stage II which consists of the following four packages: Package I - consisting of preconstruction works (access roads, permanent camp, etc.), dam foundation grounding, drainage gallery tunneling and the river diversion tunnels, together with consulting services associated with these activities. Package II - consisting of all civil works for the main dam, and appurtenant structures, reservoir resettlement, installed mechanical equipment and consulting services. This Package is the subject of the present report and the proposed Bank loan. Package III - consisting of the civil works for the power component, together with the supply and installation of penstocks, turbines, generators, electrical and mechanical equipment and transmission lines. Package IV - consisting of construction of the Baligatan diversion dam and the civil works for irrigation development of 27,000 ha of currently rainfed land.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project