MAGAT RIVER IRRIGATI
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Third Magat River (stage 2 irrigation) Project consists of: (a) construction of the Baligatan diversion dam; (b) construction of irrigation and drainage facilities and roads on a total area of about 26,770 ha of currently rainfed land; (c) construction of three pumping stations of serve lands at higher elevations covering 8,000 ha of the project area; (d) supply and installation of pumps, moto
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Raw Materials, Government
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MAGAT RIVER IRRIGATI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Third Magat River (stage 2 irrigation) Project consists of: (a) construction of the Baligatan diversion dam; (b) construction of irrigation and drainage facilities and roads on a total area of about 26,770 ha of currently rainfed land; (c) construction of three pumping stations of serve lands at higher elevations covering 8,000 ha of the project area; (d) supply and installation of pumps, motors, auxiliary equipment and pipelines; (e) provision of consulting services to assist NIA in designing the pumping stations, and procurement, installation and testing of pumping equipment; and (f) procurement of vehicles and equipment for project implementation and operation and maintenance. About 8,000 farm families and 4,400 landless laborers' families, most of whom are below the poverty line, will benefit directly from increased production and consequent employment. The project will create a demand for an additional two million man-days of farm labor per year equivalent to some 8,400 full-time jobs. At full agricultural development the project will about $25 million per year at forecast world market prices. The economic rate of return is sensitive to the possibility of farmers achieving less than expected yields. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Philippines |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Philippines
- Design and construction of the third bridge of the Candaba Viaduct awarded by the NLEX Corporation in the north of Manila (Philippines)
- Metro Manila Skyway (MMS) Stage 3
- South Luzon Tollway Corporation
- Daang Hari-SLEX Link Road
- Bocaue Toll Barrier expansion
- North Luzon Expressway (NLEX) Harbor Link Tollway Project, Manila, Philippines
- NAIA Expressway
- Manila North Tollway Corporation
