MAGESTIC Project for Green Energy Usage and Transmission Capacity Strengthening
The owner, status and timeline of this project. A free account opens every field.
Source: Zee News
The Maharashtra Cabinet approved the MAGESTIC project (Maharashtra: Accelerating Green Energy and Storage Technologies Integration in Connected Grid) to strengthen green energy usage and transmission capacity. The project will be funded via a loan from the World Bank and the preliminary project report has been sent to the Central Government.
- Status
- Prospective
- Sector
- Government
- Location
- Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Zee News
ConstructChat
Ask ConstructChat about MAGESTIC Project for Green Energy Usage and Transmission Capacity Strengthening
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Maharashtra Cabinet approved the MAGESTIC project (Maharashtra: Accelerating Green Energy and Storage Technologies Integration in Connected Grid) to strengthen green energy usage and transmission capacity. The project will be funded via a loan from the World Bank and the preliminary project report has been sent to the Central Government. |
Original sector | Energy |
Location
Country | India |
State | Maharashtra |
City | Mumbai |
Source
Source | Zee News |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
